Future Projects

Overland Park RoadThe Public Works Department is responsible for the design and construction of projects included in the Capital Improvements Program. These projects include thoroughfare and residential street upgrades, intersection improvements, as well as storm sewer repairs.

The following projects are scheduled for construction in:

2016

  • 137th & Nall Traffic Signal
  • 151st & Marty Traffic Signal
  • 159th, Nall to Mission
  • 2016 Major Storm Sewer Repair, 87th Street from US 69 to Santa Fe Drive
  • 2016 Neighborhood Street Reconstruction Program
  • Antioch & Hardy Traffic Signal
  • Deanna Rose Farmstead Storm Sewer Improvements
  • OP Public Safety Facility
  • Switzer Road, College Blvd to Indian Creek

2017

  • 143rd Street, Pflumm to Quivira roads
  • 2017 Neighborhood Street Reconstruction Program
  • 2017 Streetlighting (Various locations)
    • Johnson Drive, Robinson to¬† Floyd
    • 87th to 93rd streets and Cody to Barton
    • Lamar Avenue, 83rd to 103rd streets
    • Nall Avenue, 83rd to 95th streets
    • 95th Street, Cedar to Catalina
    • 107th Street, Metcalf to Nall avenues
    • Lamar, 108th to Indian Creek Parkway

More detailed project information, including road closures, will be available once a project begins.