Standards:
Stormwater Treatment
- APWA/MARC BMP Manual
- Overland Park Stormwater Treatment Standards
- Stormwater Treatment Standards - Attachment A - Stream Corridor Evaluation Worksheet
Stormwater Conveyance
Ordinances:
- Chapter 15.10 – Stormwater Management Program – Standards and Permitting
- Chapter 16.210 - Stormwater Treatment Ordinance
- Chapter 18.360 – Floodplain Management Ordinance
- Chapter 18.365 – Stream Corridor Requirements
City Policies:
- Stormwater Management Studies
- Stream Corridor Development Plan Requirements
- US Army Corp of Engineers Section 404 Permitting Requirements
Stormwater Related Easements/Agreements:
- Permanent Drainage Easement
- Detention Basin Maintenance Agreement (for detention outlet works on Public Storm Sewer system)
- Private Lake Agreement (required for new private lakes in residential subdivisions)
- Stormwater Treatment Maintenance Agreement
- Stream Corridor Maintenance Agreement
Work in the Floodplain
(Areas designated as Special Flood Hazard Area):
- Floodplain
Development Permit Application and Checklist (required for any
work in Special Flood Hazard Area)
- FEMA
Floodplain Elevation Certificate
- FEMA No Rise Certificate (required for work in the floodway)
